Home

Updated On: 21.02.23

2015-02 Pilatus Aircraft: The 100th PC-21 rolled off the final assembly line at Pilatus factory in Switzerland. The turbo-prop trainer aircraft is built for Royal Saudi Air Force, and it is also the 1000th turboprop trainer to be produced at Pilatus. Three national air forces are currently using the PC-21 aircraft for ··»

2015-02 Indian Air Force: Production of 42 Hawk AJTs for Indian Air Force (IAF) was concluded in 2012. Antoher contract was signed between the IAF and HAL on 2010 for another 40 Hawk AJT. Hindustan Aeronautics Limited (HAL) has so far produced 21 aircraft and will deliver the rest by 2017.HAL would support the Hawk project for ··»

2014-12 News Blog: Singapore longest car on the road will be a 8 metre long special version of Chrysler 300 aka the Limo Seng (limousine). The limo, which seats eight passengers, is twice the length of a normal Chrysler 300. According to LTA they "would be the longest stretch limousines to ··»

2014-12 Peoples Liberation Army Air Force: The Peoples' Liberation Army Air Force (PLAAF) have made recruiting and training changes are part of a trend since the 1990s in which China has been gradually creating a Western style air force. It's not just with modern aircraft but with modern training methods and tactics as ··»

2014-09 Republic of Singapore Air Force: The Alenia Aermacchi M-346 Advanced Jet Trainer aircraft was inaugurated into 150 Squadron at Cazaux Air Base in France. The 150 Squadron has received the full fleet of 12 M-346 aircraft. Singapore's Minister for Defence Dr Ng Eng Hen was in France to officiate the ceremony.   Dr Ng ··»

2014-02 Jet Airways (India) Ltd: For pilots flying commercial jets into the Kushok Bakula Rimpochhe Airport in Leh, the toughest experience is not the landings and takeoffs but the training. The training mandated in order to certify pilots as qualified to operate on this airfield is several times tougher. Every pilot operating in ··»

2013-10 CA NATO FTC: The NATO Flying Training in Canada program celebrated 200,000 flying hours on the CT-156 Harvard II aircraft at 15 Wing Moose Jaw. This 200,000 hour milestone was attained after 13 years with 24 aircraft at the 15 Wing.The NATO Flying Training in Canada program is widely recognized as ··»

2013-05 Aermacchi M-346 Master: Alenia Aermacchi’s twin-engine trainer prototype, registered as CMX617, had experienced a technical problem about 20 minutes into its sortie from Turin-Caselle airport. The 41-year old test pilot, Matteo Maurizio, ejected but sustain some injury. The aircraft crashed near the town of Piana Crixia in Val Bormida, between the ··»

Flip to: Page 1 Page 2 Page 3 Page 4

Yearly Archives: 2015…2 2014…4 2013…3 2012…11 2011…3 2010…2 2009…3 2004…1 2003…1

Related Pages: